20250916 v 2.5.0

Prev Next

Application release notes

Important: Please note that not all newly released features are guaranteed to be backward compatible; in some cases, adjustments to existing projects or re-simulation may be required to ensure full functionality.

Release date

Software version

16.9.2025

2.5.0

General

  • Federated identity provider (IdP) integration is rolling out, enabling customers with enterprise accounts to use their own IdP (e.g., Google Workspace, Okta) for authentication.

  • Multi-factor authentication is now supported.

  • Overall platform performance has been improved, and several action buttons have been relocated more consistent workflows.

  • Home, Prospect, and Evaluate project managers are now more unified in both features and design.

  • Users can now archive multiple projects at once.

Prospect

  • The design and behavior of the project manager is now aligned with Home and Evaluate for a unified user experience.

  • “Country” has been added as a new column in the project list.

  • Marking multiple projects on the map is no longer supported.

Evaluate

  • Download functionality for Reports & Exports has been redesigned to better handle strict network security settings commonly used by corporate customers.

  • Evaluate now supports multiple data sources:

    • Users can request the latest Solargis data version for their projects.

    • Data sources can be viewed and requested on the Project data screen (Figure 1).

    • Selected data sources are available for running new simulations.

    • Different data sources can be used in the Energy System selector and ES list.

    • Reports and Exports can now reference selected data sources.

  • PV exports now use 15-minute data resolution by default.

Energy system designer

  • Monthly and yearly time series charts have been introduced to the snow and soiling losses (Figure 2).

  • Restricted areas and restricted lines now follow terrain for more accurate layout design (Figure 3).

  • Restricted areas now support buffer zones, improving flexibility when defining no-build regions.

  • PV module filtration criteria have been updated, offering users more precise control when selecting modules.

  • The application now prevents accidental closing of the tab during project work to protect user progress.

  • The time slider now allows selection of a 1-minute time step, enabling finer resolution for shading analysis.

  • All ESD export files are now generated with proper filenames for easier identification and management.

  • Bill of Materials (BOM) can now be generated even if the Solargis model for soiling or snow is invalidated.

  • Interactive BOM data—including prices and custom items—are now included when exporting the BOM to XLSX format.

  • Resolved an error that occurred when editing restricted lines.

Reports & exports

  • Uncertainty is now supported in reports for projects where Uncertainty data was provided.

    • Chapter 1 (Summary) now displays Uncertainty data.

    • A new Chapter 8 (GHI and DNI uncertainty, probabilities of exceedance) has been introduced.

PV simulator

  • The Transient thermal correction model is now also used for 15-minute data simulations.

  • Soiling losses on the back side of a bifacial module are calculated as 15% of the soiling losses applied to the front side.

Figure 1: New data source available for your project in the Project data section.

Figure 2: Soiling loss monthly time series visualization in the energy system designer.

Figure 3: Terrain-following restricted areas.