---
title: "20251203 v 2.6.0"
slug: "20251201-v-260"
description: "Explore the latest Solargis updates: enhanced project management, improved PV simulation accuracy, and new data export options for better analysis."
updated: 2025-12-03T18:53:02Z
published: 2025-12-03T18:53:02Z
canonical: "kb.solargis.com/20251201-v-260"
---

> ## Documentation Index
> Fetch the complete documentation index at: https://kb.solargis.com/llms.txt
> Use this file to discover all available pages before exploring further.

# 20251203 v 2.6.0

### Application release notes

> [!WARNING]
> **Important**: Please note that not all newly released features are guaranteed to be backward compatible; in some cases, adjustments to existing projects or re-simulation may be required to ensure full functionality.

| Release date | Software version |
| --- | --- |
| 1.12.2025 | 2.6.0 |

### General

- Project Manager – project list and map:
  - Projects are now sorted by last activity (update date).
  - The line measurement tool has been reintroduced for Prospect map and added to the Home and Evaluate maps.
  - We have improved the loading time in the project list and map for users with a large number of projects.
  - Map clustering has been introduced for enhanced user experience when working with maps.
- Customer admin changes (Figure 1 & Figure 2):
  - “Billing & payments” section has been renamed to “Orders & payments.”
  - Order & payments page offers improved UX and new features such as downloading pro-forma invoices, final invoices, and payment receipts (when generated).
  - We have improved the order detail list view to provide a better overview of historical and current orders.
  - New list fields now include order items and an enhanced UX for delivery and payment status.

### Prospect

- Project search functionality now also searches within existing projects.

### Evaluate

- The Project data page has been divided into two tabs (Solargis data and Imported data) for better asset organisation.
- Customers now automatically receive the up-to-date version of their data source when upgrading projects from Early stage to Full evaluation.
- Temporal resolution of the data used in the available energy systems is now visible in the energy system selector for quick reference.
- Users can now use the Project data page to upload up to 5 custom terrain data files (GeoTIFF file format) to use in their designs for enhanced simulation results.
- The charts in the Analysis section now display units also on the ‘y” axis.
- The PV statistics/PVOUT specific and PR page now shows monthly performance ratio values.
- The PVOUT_DC_CLIP value has been split into PVOUT_DC_SELF_CLIP and PVOUT_DC_CLIP values to provide more transparency in losses representation, and this is reflected on all related pages and reports.
- Unavailability losses on the Losses page are now presented in a separate table.

**Energy system designer**

- Fixed-mounting PV systems are now supported with a terrain-following feature (Figure 3):
  - Segments can now be set as “Terrain following” or as “Planar segments”.
  - Ray-tracing simulation supports terrain following fixed one-angle mounting.
- Building segments have been converted to Polygon shading objects:
  - You can now generate a restricted area underneath the object with custom exclusion zone settings.
  - The object can be moved by the move tool.
  - It adapts to undulated terrain.
  - It now reflects light more realistically thanks to the improved texture rendering.
- It is now possible to set terrain blending (grading) around the segment to avoid terrain artifacts.
- The Save button has been split to offer additional “Save and close” and “Close” options for increased flexibility.
- Grid connection frequency has been added to the grid connection settings.

**Reports & exports**

- Users can now select a date range for their exports.
- Error messages for report generation have been improved to provide more clarity.

![](https://cdn.document360.io/ae2d502f-6c0d-4865-a68e-43ad8da61149/Images/Documentation/image-WYM2LHXE.png)

***Figure 1****: See transactions in the Evaluate admin section.*

![](https://cdn.document360.io/ae2d502f-6c0d-4865-a68e-43ad8da61149/Images/Documentation/image-DX778AJG.png)

***Figure 2****: New Orders & Payments page in Company admin.*

![](https://cdn.document360.io/ae2d502f-6c0d-4865-a68e-43ad8da61149/Images/Documentation/image-ATRVFLYA.png)

***Figure 3****: Terrain-following fixed-mounting PV system.*
