---
title: "20250422 v 2.2.0"
slug: "20250402-v-220"
description: "Explore new project collaboration features, updated data, and enhanced reporting in the latest Solargis application release notes for improved project management."
updated: 2025-07-15T08:32:59Z
published: 2025-07-15T08:32:59Z
canonical: "kb.solargis.com/20250402-v-220"
---

> ## Documentation Index
> Fetch the complete documentation index at: https://kb.solargis.com/llms.txt
> Use this file to discover all available pages before exploring further.

# 20250422 v 2.2.0

### Application release notes

> [!WARNING]
> **Important**: Please note that not all newly released features are guaranteed to be backward compatible; in some cases, adjustments to existing projects or re-simulation may be required to ensure full functionality.

| Release date | Software version |
| --- | --- |
| 22.4.2025 | 2.2.0 |

### General

- A link to the [PV components catalog](/v1/docs/pvcc-introduction) has been added to the Solargis Home dashboard.
- A new project collaboration manager has been introduced to Prospect and Evaluate projects (Figure 1):
  - You can allow other users from your company account to view your projects (read-only access).
  - You can transfer the ownership of the project (owner can edit the project).
  - You can view or edit projects only in applications to which you have been granted access.
  - The list of projects on the projects page now displays project ownership and collaboration status.
- Pollution losses have been renamed to soiling losses to meet the industry standards.

![](https://cdn.document360.io/ae2d502f-6c0d-4865-a68e-43ad8da61149/Images/Documentation/image(840).png)

***Figure 1:****Project access manager.*

### Prospect

- Prospect data have been updated with year 2024 LTA values.

### Evaluate

- A new Project history page has been added to the project menu to help track the project activities (Figure 2).
- A new Project data page has been introduced to the project menu to manage add-ons and their status (Figure 3).
- You can now request 1-minute data as an add-on on the new Project data page:
  - The data is delivered automatically.
  - Notifications about the data delivery and low SGU have been created to notify you about their status.
  - You can export the 1-minnute data directly from the application.
- Standard deviation has been added to the monthly statistics of the solar resource data in the analysis section.
- Performance ratio (PR) parameter have been added to the monthly statistics table in the PVOUT-specific analysis category.
- Tables in the PV losses section have been improved for better readability.

**Energy system designer**

- The maximum energy system size has been increased to 500MWp.

##### Reports & exports

- All Evaluate application improvements and changes are reflected in the respective reports.

![](https://cdn.document360.io/ae2d502f-6c0d-4865-a68e-43ad8da61149/Images/Documentation/image(841).png)

***Figure 2:****Project history page.*

![](https://cdn.document360.io/ae2d502f-6c0d-4865-a68e-43ad8da61149/Images/Documentation/image(842).png)

***Figure 3:****Project data page.*
