Application release notes
Release date | Software version |
---|---|
22.1.2025 | 2.00 |
General
General improvements
A link to the application's Terms of Use has been added to the Helper tool.
The list of recent projects on the Dashboard has been redesigned and logically reorganized. It now displays projects based on their highest app status, shows which subscription is assigned to each customer and user, and only includes projects that are visible within the application.
Prospect
General Prospect improvements
The “Request free trial“ button has been removed from the application. Free Prospect trials are no longer available.
Evaluate
General Evaluate improvements
The service cost in SGU is now displayed in the project activation and simulation execution dialogs to enhance transparency.
From now on, the account admin will receive email notifications when the account enters a limited subscription period or when the SGU level is low.
The generation of PV simulation requests has been moved to the PV simulation phase, resulting in faster energy system (ES) savings.
A new Simulations tab has been added to summarize all running and pending simulations.
The Energy Systems table has been enhanced, allowing PVOUT total values to scale from kilowatt-hours (kWh) up to gigawatt-hours (GWh).
Additional visual and data improvements have been made.
Energy system designer
You can now copy array/inverter setup properties from the respective properties panel using the three-dot menu and apply them to different arrays/inverter setups.
You can now export 3D scenes to the Collada file format directly from the system properties in the energy system designer.
The performance of the designer has improved in handling bigger energy systems.
A change in the snow loss configuration now does not invalidate the PV simulation.
Reports & exports
The naming in the generate menu now aligns with the name of the given report for clarity.
Reports now include PVOUT total and specific details such as External, Internal, and availability losses.
Shaded and non-shaded solar data are now more clearly differentiated.
Reviews based on TMY data have been simplified to focus on key parameters affecting:
Review of Solar Resource and Climate Conditions.
Review of Photovoltaic Energy Project.
The PV Report and Review now includes a basic reference to the PV summary Annex 1, enhancing coordination with multiple documents. This affects:
Site Assessment of Solar Resource and Climate Conditions.
Full Evaluation of Photovoltaic Energy Project.
The PV Report and Review cover page now includes the Energy system name, impacting:
Site Assessment of Solar Resource and Climate Conditions.
Full Evaluation of Photovoltaic Energy Project.
Overall textual improvements have been made, including consistency in referring to acronyms and definitions.
Additional minor visual and data improvements have been implemented.
Issues with incorrect time steps in hourly histograms have been resolved.